Walthamstow Academy

mf7Client: Walthamstow Academy
Project:  Classroom Building
Completed: June 2014
Floor area: 325m²
Value: £365,000

Turnkey service elements completed:

  • Design
  • Manufacture
  • Delivery
  • Installation
  • Internal fit out

“The installation of the buildings went very smoothly. We are very pleased with our new buildings”

Vice-Principal

Modulek provided a full ‘Turnkey’ service to the school, supplying and installing two double classroom building over the summer ready for the new school year.

Both identical, the buildings have been designed with a mixture of render and attractive cedar cladding externally. The groundworks included providing a level access whilst adapting to existing ground levels and extensive service connection enabling works. The project also involved liaising and working with the school’s specialist service installation provider.

The light and airy classrooms provide the school with the perfect environment for their pupils to continue their education.

Key Benefits of using Modular:

  • Affordable
  • Manufactured off-site
  • Minimal preparation required
  • Short build time
  • Rapid installation
  • Waste reduced
  • Minimal disruption