RSPB

mf7Client: RSPB
Completed: August 2017
Project Duration: 4 weeks
Value: £160,000

Turnkey service elements completed:

  • Design
  • Manufacture
  • Groundworks
  • Footpaths
  • Eco Installations
  • Delivery
  • Alterations to existing building
  • Service Connections

Modulek used their expertise to produce a bespoke design utilising their flexible modular system as an extension to an existing building. This project was delivered within a restricted budget, with speed, whilst ensuring the client had the minimum of disruption to a busy site, with multiple visitors most of the year round.

The building provided brand new state of the art toilet and changing  facilities, incorporating an eco-friendly look and feel with features sympathetic with the aspirations of the client, RSPB. The project encountered many challenges such as contaminated and poor ground conditions which required specialist Quadra piles providing a suitable foundation base which if traditional heavyweight construction had been used wouldn’t have been possible.