Moor House School

mf7Client: Moor House School
Project:  Classrooms
Completed: September 2019
Floor area: 170m²
Value: 281,065

Turnkey service elements completed:

  • Groundworks
  • Design
  • Manufacture
  • Delivery
  • Installation
  • Internal fit out and finishing
  • Service Connections

Moor House School required a fast, permanent modular building solution to replace their existing DT and Pottery Classrooms. They required a full turnkey package that incorporated manufacture of modules, groundworks, foundations, delivery, craneage, installation and flooring, along with the interior fit out of the DT and Pottery classrooms.

Solution

Modulek worked with Moor House School to design and install replacement Design and Technology, and Pottery classrooms. The new classrooms are spacious rooms, that are modern and feature the latest technologies to drive innovation and change within these two key subject areas. Clad in a natural-effect timber, the buildings blend in beautifully with their natural surroundings, creating a building that is appealing, and attractive, so that students are inspired to learn!

Modulek provided a complete turn-key service, from helping Moor House School attain planning permission and approvals, through to installing all foundations and constructing and fitting out the building.

Once again, a Modulek solution that was delivered on time and on budget!