Christ the King School

School Funding for Modular Buildings

mf7

Client: Bournemouth Borough Council
Project: Christ the King School
Completed: August 2015
Floor area: 668m²
Value: £1,200,000

Turnkey service elements completed:

  • Design
  • Groundworks
  • Off-site Manufacture
  • Installation
  • Internal Fit Out
  • Service Connections

‘Just want to say many thanks for all you hard work and completing once again a stunning building’

Gillian Glutz, Bournemouth Borough Council

The project was a fast track operation enabling the client to have vital primary teaching space up and running for the new September term, to meet the demand for extra places in the local catchment area.

Modulek were able to carry out the project in the six week summer holiday period ensuring the school experienced the minimum of disruption, on what is a logistically challenging site with the confined space to work within.

The design of the building had to blend in with the surrounding traditionally constructed buildings so that was of a permanent appearance on a par with the adjacent structures on-site.